MM Services completed clearing 10 miles of transmission pipeline ROW near Tomahawk, Wisconsin in early 2021.
Years of sediment were deposited into this retention pond, resulting in over flow problems during the spring thaw. MM Services restored the pond to its' original design and hauled away the sediment.
Harsh winter conditions resulted in damaged perimeter fence. MM Services replaced the damaged posts and secured the chain link fence to better than previous condition.
After years of erosion, the pipeline right-of-way needed additional topsoil to replenish the ground. MM Services provided the matting, grading and restoration on this project.
MM Services cleared 10 miles of transmission pipeline right-of-way through sensitive urban and residential areas while being mindful of the local farmers winter crops.
MM Services was responsible for the concrete demo, subbase preparation, rebar installation, concrete installation (24" slab) and anchor layout/installation for 2 jib cranes inside tight quarters of a compressor building.